Home Addition Cost Calculator — Estimate by Type & Region

Plan a room addition, second story or conversion. Compare low, typical and high budgets, then replace the example allowances with local prices.

Quick mode

Quick addition estimate

Choose an addition type, total area and finish level for a planning range.

Addition

Project size

Enter all added/converted floor area, not lot area.
Direct area is the TOTAL across all stories. Dimensions are per story. Footprint = total area ÷ stories.

Finish

Changes the editable finish factor below; only checked lines use it.

Results update automatically as inputs change.

Results

Estimated project range
—

View key breakdown

Detailed results and professional tools

View detailed results, reports and comparisons

Calculation report

A focused summary of the selected scope, active cost lines and estimate. Changes are saved automatically in this browser.

Enter valid inputs to create a report.

Project and quote notes are included in shared links. Leave out private client details. Long projects may exceed the share-link limit.

Where the budget goes

Budget component Low Typical High

Itemized cost ranges

Included scope Quantity Combined factor Low Typical High Price basis

All rates and factors are visible under Advanced. Category totals use unrounded arithmetic; individually displayed currency amounts can differ from their rounded total by a small amount.

Compare up to three addition budgets

Keep the current scenario, change the size or scope, and compare its range, cost per area and typical trade breakdown. Scenarios remain in this tab only; export projects for long-term storage.

Worked example: a 400 ft² bedroom addition

This is the calculator’s illustrative US-dollar scenario, not a published contractor quote: one story, standard finishes, 8 ft ceiling, 1× local factor, four windows and one exterior door. It includes a slab, framing, standard services, design/engineering and permit allowances. It does not add a bathroom.

The engine gives direct construction of $88,800 in the typical scenario. Add 15% contractor markup ($13,320) and $9,300 soft costs. With no additional tax and 15% contingency ($16,713), the typical planning total is $128,133, or $320/ft². The selected low/high rates produce $76,915–$206,710.

For the slab line alone: 400 ft² × $30/ft² × 1 local factor = $12,000 typical. For roofing: 400 × 1.15 = 460 ft² allowance area, then 460 × $20 = $9,200. These are different quantity bases—not a second charge for extra stories.

Inputs explained — what changes the answer?

  • Area and stories: floor-based costs follow total floor area; foundation/site costs follow the footprint. Dimensions mode multiplies length × width × stories.
  • Finish level: the displayed factor affects only checked lines. A kitchen also needs plumbing, cabinetry and electrical scope; the finish multiplier alone does not create those items.
  • Foundation and structural tie-in: choose the actual scope and replace placeholder rates. Existing foundations are not automatically adequate for added loads.
  • Ceiling and roof geometry: these are editable allowance factors, not a detailed materials takeoff. Set a quoted lump sum when that better matches the job.
  • Region: label the project and supply local rates or a manual factor. No region silently changes the result.
  • Low / typical / high: enter a defensible range for each scope. The model sums corresponding bands; the result is not a probability interval.

Addition example library

Geography: US, no locality calibration. Currency: USD. Reviewed: 2026-09. Source for every numerical preset: Efficienco illustrative planning assumptions, not the organizations cited below. These totals use the exact same engine, 1× local factor, standard finishes, 15% OH&P and 15% contingency. Expand cost lines to see inclusions/exclusions. Load a type at the top to edit it.

Example typeTotal ft²LowTypicalHigh
Bump-out120$33,717$60,104$99,556
Bedroom400$76,915$128,133$206,710
Family / living room400$76,915$128,133$206,710
Home office400$76,915$128,133$206,710
Bathroom100$39,436$70,737$121,092
Kitchen expansion200$63,479$111,999$189,571
Primary suite600$121,299$201,664$326,608
3-season sunroom240$52,571$90,521$148,086
Conditioned / 4-season sunroom240$57,755$100,255$163,692
Attached garage400$55,888$92,426$149,578
Garage conversion400$39,462$74,307$130,376
ADU / in-law suite — INCOMPLETE known-cost subtotal600$140,078$238,033$389,427
Over-garage addition400$89,321$157,625$266,064
Second-story addition800$143,411$244,249$402,546
Custom conditioned space400$76,915$128,133$206,710

The ADU example needs a manually priced utility-connection allowance; its displayed subtotal is incomplete. Different example sizes mean this is not an apples-to-apples type comparison. Use the scenario feature with the same size and matching scope for that comparison. Small wet-room or unusual structural work can fall outside the examples.

Formula & methodology

  1. Total area = entered area, or length × width × stories. Footprint = total area ÷ equal-sized stories. Roof allowance area = footprint × roof factor.
  2. Each cost line = its quantity × selected band’s rate × any enabled local, finish and ceiling-height factors.
  3. Direct construction = sum of included construction lines. Soft costs = sum of included design, fee and other soft-cost lines.
  4. OH&P = direct construction × markup %. Tax = manually entered taxable amount × tax %.
  5. Contingency = (direct + OH&P + soft costs + tax) × contingency %. Total = that subtotal + contingency.
  6. Cost per floor area = complete project total ÷ total added/converted floor area.

OH&P here is a markup on cost, not profit margin on selling price. No fixed materials/labor split, automatic financing cost, home-value gain or inflation adjustment is applied.

Common budgeting mistakes

  • Entering total two-story floor area and then multiplying it by two again.
  • Adding contractor markup to a quote that already includes it, or charging permit inspections twice.
  • Using a bathroom plumbing allowance without including the vanity, tile/waterproofing or other required finishes somewhere in the budget.
  • Using new-build square-foot rates as a guaranteed small-addition quote. Mobilization, existing-building repairs and structural connections can dominate.
  • Leaving utility connections, soil work, surveys or hazardous-material work excluded without verifying they are unnecessary.
  • Changing currency labels or broad region and assuming the prices were automatically converted or localized.

Assumptions, exclusions & sources

Use this as a planning worksheet, not a contractor quote, appraisal, tax calculation, permit determination or structural design. Foundation capacity, beams, soil conditions, zoning, energy rules and service capacity need project-specific review. All-in quotes should replace overlapping lines, not be added on top.

Sources reviewed 2026-09-02. The references explain context and where to obtain better project-specific data; they do not supply or endorse this calculator’s numerical example rates.

No geographic rate dataset was available to substantiate state/ZIP precision. User-entered dated quotes should replace the illustrative values. No land purchase, financing, resale uplift, temporary accommodation, future property tax or unentered work is included.

Frequently asked questions

How much does a home addition cost per square foot?There is no single dependable rate for every addition. Divide a scope-complete project estimate by its total added floor area. This calculator builds a range from editable quantities, unit rates, contractor markup, fees, tax and contingency. Its starting prices are illustrative examples, not verified local averages.
Are permits, design fees and contingency included?Yes, when their lines or percentages are included. The default bedroom example has design, engineering, permit, contractor-markup and contingency allowances. Separate inspections, surveys and utility connections start excluded. Check your jurisdiction and avoid adding fees already included in a contractor quote.
Does the region selector provide local prices?No. The region is a project label, and the local multiplier is your editable assumption. There is no ZIP-code lookup or automatic state cost index. Replace example rates with dated local prices and turn off adjustments for quotes that already include them.
How do I compare building out and building up?Use the matching addition preset or construction-direction scope control, then verify foundation work, reinforcement, stairs, roof removal and services. Building up is not priced by one universal multiplier, and this tool does not assess whether an existing structure can carry another story.
Why do empty prices make my estimate incomplete?A blank active rate means the cost is unknown, not free. That entire line is excluded from the known-cost subtotal until all three rates are entered. Enter an explicit zero only when the cost is intentionally zero, or exclude the line if its scope is covered elsewhere.
Will switching to square metres change my budget?No. The calculator converts dimensions and per-area rates together, preserving the physical project and total cost apart from floating-point rounding. Currency selection only changes labels; it does not convert exchange rates.
Does Typical mean the most likely final contractor price?No. Typical is the middle rate scenario you entered, not a measured market average, probability forecast or contractor quote. Low and high are planning scenarios and are not guaranteed minimum or maximum prices.